ALUMINIUM LIFT SHAFT’S

Project Description

Since 2012 Fjellstrand has completed 18 projects, with a total of 635 mtr, 11.408 m3 and 472 tons aluminium lift shaft constructions

  • Conoco / Aker Egersund
    2 Lift Shaft’s, with a total of 43 mtr, 419 m3 and 22 tons aluminium
  • Dong Energy
    1 Lift Shaft, with a total of 42 mtr, 713 m3 and 29 tons aluminium
  • Gina Krog
    2 Lift Shaft’s, with a total of  82 mtr, 1700 m3 and 81 tons aluminium
  • Johan Castberg
    1 Lift Shaft, with a total of 18 mtr, 192 m3 and 12 tons aluminium
  • Johan Sverdrup
    8 Lift Shaft’s, with a total of 327 mtr, 6.650 m3 and 261 tons aluminium
  • Ringhorne
    1 Lift Shaft, with a total of 42 mtr, 420 m3 and 18 tons aluminium
  • Statoil
    1 Lift Shaft, with a total of 30 mtr, 504 m3 and 19 tons aluminium